The commission set up to assess Berezovskaya GRES branch of Unipro PJSC operational readiness for the 2016-2017 winter season of maximum loads completed its work.
The commission was composed of Alexey Pakhomov, Technical Controlling Director at SO UES JSC Siberian United Dispatching Office branch; Vladimir Naumkin, Director of the Western Territorial Office of the Federal Environmental, Industrial and Nuclear Supervision Service Yenisei Department; Dmitry Likhosherstov, Deputy Chief Inspector on Fire Supervision for the Krasnoyarsk Territory; and top managers of Unipro PJSC engineering function headed by Deputy Director General for Production Igor Popov.
Over the course of several days experts conducted on-site examination of the condition of Berezovskaya GRES operating generating equipment, the quality of repairs administered in the summer, assessed the key performance parameters of power units, competences of the staff and industrial safety management system. Under the commission’s supervision, emergency response trainings were successfully administered that involved simulation of power unit shutdown due to hydrogen inflammation in the turbine room at the outdoor temperature of – 25о С.
The commission confirmed that Berezovskaya GRES has fulfilled the basic and supplementary conditions of operational readiness for the autumn-winter season. Operational readiness certificate for maximum loads during the autumn-winter season was handed over to Berezovskaya GRES Director Vladimir Borisov.