Publication date: 20.09.22
Back to list

Yaivinskaya GRES branch of Unipro PJSC has completed the connection of residential sector consumers and social infrastructure facilities of Yaiva settlement in the Perm Krai to the heating network

By September 15, according to the Decree of the Administration of Alexandrovsky Municipal District on the start of the heating season, the heat transfer fluid had been supplied to almost all facilities and residential buildings. But the connection of kindergartens and other social facilities to centralized heating systems had started before that date: it had already commenced as early as September 7 at the request of the heads of these establishments. To date, all facilities have been connected, with no exceptions.

To ensure smooth and uninterrupted heating season in Yaiva, during the summer power engineers prepared the entire heating infrastructure for the new heating season: they repaired the heating network pipelines and checked them for mechanical tightness and strength, inspected the valves, replaced and repaired 1033 meters of U/G district pipelines (of various diameters, two-pipe method) and relevant R/C gutters and supports in the settlement. In late August, Yaivinskaya GRES specialists performed successful hydraulic testing to show that the operated networks were ready to bear maximum loads in the coming winter.

High-quality implementation of the repair program, as well as New Build Projects aimed at enhancing the heat supply quality and reliability, enable Yaivinskaya GRES Branch to go through heating seasons without accidents or major failures.