| 24.01.17 | Shaturskaya GRES Has Increased Electric Power Generation by 8.3% |
|
In 2016, electric power generation at Shaturskaya GRES Branch of Unipro PJSC amounted to 5,306 mln kWh, which is 8.3% higher than for the same period of 2015 (4,899 million kWh). |
|
| Read more | |
| 16.12.16 | Unipro has succeeded in passing recertification of the environmental management system |
|
Unipro has obtained the Certificate of Compliance of the Company’s Environmental Management System (EMS) to the requirements of the new version of ISO 14001:2015 international standard in respect of electric and heat power generation, heat power transportation. |
|
| Read more | |
| 09.12.16 | Unipro PJSC Held Extraordinary General Meeting of Shareholders |
|
Unipro PJSC held an extraordinary general meeting of its shareholders in absentia on December 8, 2016. |
|
| Read more | |
| 10.11.16 | Unipro publishes unaudited financial results in accordance with IFRS |
|
Unipro Group has published unaudited financial results for January–September of 2016 in accordance with the International Financial Reporting Standards. |
|
| Read more | |
| 03.11.16 | Meeting of the Board of Directors of Unipro was held |
|
On 02nd November 2016, the Meeting of the Board of Directors of Unipro PJSC was held and it was decided to convene an Absentee Extraordinary General Meeting of Shareholders of the company. |
|
| Read more | |
| 02.11.16 | Unipro PJSC receives certificate of operational readiness for 2016-2017 winter season |
|
On 02 November 2016, Unipro received the Certificate of Operational Readiness for 2016-2017 winter season. |
|
| Read more | |
| 27.10.16 | Berezovskaya GRES receives operational readiness certificate for the coming winter season |
|
The commission set up to assess Berezovskaya GRES branch of Unipro PJSC operational readiness for the 2016-2017 winter season of maximum loads completed its work. |
|
| Read more | |
| 27.10.16 | Smolenskaya GRES receives operational readiness certificate for 2016-2017 winter season maximum loads |
|
Smolenskaya GRES has received operational readiness certificate for the 2016-2017 autumn-winter season. |
|
| Read more | |
| 24.10.16 | Yaivinskaya GRES received a certificate of readiness for operation in the winter season of 2016–2017 |
|
Yaivinskaya GRES Branch of Unipro PJSC received a certificate of readiness for operation in the winter season of 2016–2017. |
|
| Read more | |
| 21.10.16 | Shaturskaya GRES received a certificate of operational readiness for the autumn-winter period 2016–2017 |
|
Shaturskaya GRES Branch of Unipro PJSC is ready for operation in the autumn-winter season of 2016–2017. The inspection of the power plant was performed by a designated commission, including representatives of the Ministry of Energy, Rostekhnadzor, EMERCOM of Russia, System Operator, and Moscow representative office of Unipro PJSC. |
|
| Read more |