| 29.07.16 | Unipro PJSC Subsidiary and Kubanenergo PJSC Signed Energy Service Contracts for Installation of Smart Meters |
|
OOO Unipro Engineering, a subsidiary of Unipro PJSC, and Kubanenergo PJSC have signed two energy service contracts to create an electric power commercial and technical metering system with remote data collection at Kubanenergo PJSC facilities. |
|
| Read more | |
| 28.07.16 | Unipro Publishes RAS Financial Statements for the First Half of 2016 |
|
Unipro PJSC publishes its financial statements for the first six months of 2016, prepared in accordance with the Russian Accounting Standards (RAS). |
|
| Read more | |
| 21.07.16 | In the first half of 2016, the power plants of Unipro PJSC generated 28.0 bln kWh |
|
The power plants of Unipro PJSC have generated 28.0 bln kWh for the period between January and June 2016, which is 7.1% higher compared to the corresponding period of 2015. |
|
| Read more | |
| 15.07.16 | E.ON Connecting Energies LLC purchased a share in NATEK Invest-Energo JSC |
|
On July 14, 2016, E.ON Connecting Energies LLC, an affiliate company of Unipro PJSC, bought a 50% share in AO NATEK Invest-Energo. |
|
| Read more | |
| 07.07.16 | Overhaul of Power Unit No. 3 Started at Smolenskaya GRES |
|
Power Unit No. 3 of Smolenskaya GRES Branch of Unipro PJSC has been shut down for overhaul as per the schedule agreed upon with the System operator. |
|
| Read more | |
| 29.06.16 | Meeting of the Board of Directors of Unipro PJSC Was Held |
|
On 28 June 2016, the Board of Directors of Unipro PJSC unanimously elected Klaus Schäfer, CEO and Member of the Management Board at Uniper SE, as the Chairman of the Board of Directors. Maxim Shirokov, General Director of Unipro PJSC, was elected to the position of the Deputy Chairman of the Board of Directors. |
|
| Read more | |
| 16.06.16 | E.ON Russia Held Its Annual General Meeting of Shareholders |
|
The Annual General Meeting of Shareholders of E.ON Russia JSC was held in Moscow on 15 June 2016. |
|
| Read more | |
| 14.06.16 | Berezovkaya GRES Puts Power Unit No. 1 Out of Service for Overhaul |
|
E.ON Russia Berezovkaya GRES has shut down Power Unit No. 1 for overhaul as per the schedule agreed upon with the Joint Dispatching Office of Siberian Energy Systems (JDO of Siberia). |
|
| Read more | |
| 30.05.16 | Surgutskaya GRES-2 Has Closed the Heating Season |
|
E.ON Russia Surgutskaya GRES-2, the largest heat supplier in Surgut, has successfully completed the 2015/2016 heating season. |
|
| Read more | |
| 26.05.16 | Surgutskaya GRES-2 goes through flood period without emergency situations |
|
E.ON Russia Surgutskaya GRES-2 has successfully completed the 2016 flood discharge operations. |
|
| Read more |